The Interim Water Quality Standards for Class 1 are as follows.

Class 1 is considered a very clean water. The water need no treatment as it only need to boil as a drinking water. The supply of drinking water or any sensitive aquatic species must follow this standard to ensure it safe to use.


Ammonical Nitrogen (mg/l)- 0.1

BOD (mg/l) - 1

COD (mg/l) - 10

DO (mg/l) - 7

pH - 6.5-8.5

Colour (TCU) - 15

Electrical Conductivity (mmhos/cm) - 1000

Floatables -

Odour -

Salinity (o/oo) - 0.5

Taste - N

Total Dissolved Solids (mg/l) - 500

Total Suspended Solids (mg/l) - 25

Temperature (oC) -

Turbidity (NTU)- 5

Faecal Caliform* (counts/100ml) -10

Total Coliform (counts/100ml) - 100

Wednesday, December 8, 2010

Accurate Flow Measurement in Large Pipes


The ADFM Pro20 from Teledyne Isco (USA) brings unparalleled flow measurement accuracy to large pipes and channels, delivering flow rate data within 2% of actual value, in flow depths up to 20 feet (6m). Four (4) piezoelectric ceramics in the sensor emit short pulses along narrow acoustic beams pointing in different directions to measure velocity. A fifth ceramic mounted in the center of assembly, and aimed vertically, is used to measure the depth.

Each acoustic beam measures velocity at multiple points, known as bin, in the water column. The measured velocity data each bin are very precise- to within 0.01ft/s. The distribution accurate velocity measurement is then used to determined the flow pattern over the entire cross-section flow. Since the flow pattern and measured velocity distribution are dependent to each other, the ADFM's advanced flow algorithms automatically adapt to changing hydraulic condition within the pipe. the removes the need for in-situ calibration and insures flow rate measurement over a host of different measurement environments and hydraulic condition.

The ADFM enclosure houses the signal processing, data logging, and data output electronics. The enclosure is available as NEMA 4X Box housing, suitable for wall or console mounting in permanent application, and NEMA 6P cylindrical housing for use in manholes or other 'wet' environments.

Sunday, December 5, 2010

Understand EIA Requirement in Malaysia

EIA REQUIREMENT In Malaysia, anyone proposing a new development project is obligated to carry out number of procedure to evaluate the project’s effects before implementation.

First Procedure : Completion of Environmental Impact Assessment (EIA)

If the proposed project comes under 1 of 19 of activities prescribed under the environmental quality (Environmental Impact Assessment) Order 1987, the project proponent must prepare EIA report in accordance with the stipulated procedure, submit to Director General of the Department of Environment (DOE) and obtain approvals.

Second Procedure : Site Suitability Evaluation and Pre-Siting Evaluation

If the proposed project not a prescribed activity subject to EIA. This evaluation report is required to assess whether the site of the proposed factory or project is compatible with other land use in the area, particularly in regard to residential zones. Evaluation is required even in planning to site the factory in an industrial estate. The DOE carries out the evaluation by checking the development plan against environmental laws and regulation.

Friday, December 3, 2010

Understanding Environmental Consultant Job in Malaysia

I've been working as Environment Consultant in Kuala Lumpur for 5 years. I love this job very-very much. I love work outstation, do a field work, do a report writing, researching, and meet people from various government department or private agency. I am still looking for upright movement in my career...as my contract job has been terminated. Anyway here just to sharing my working experience.

An environmental consultant works on commercial or government contracts to address a variety of environmental issues for their clients. They cover a wide range of disciplines such as assessment of air, land and water contamination, environmental impact assessment, environmental audit, waste management and the development of environmental policy and environmental management systems.

A career as an environmental consultant offers the opportunity for a structured professional path with good prospects for development and the potential to specialise in an area of interest.
Typical work activities

As there is such a variety in the type of work that an environmental consultant may undertake on a day-to-day basis there is clearly a wide range of typical activities. A key task is to identify whether land, air or water is contaminated by means of desk-based research and field work, and then undertake an assessment to identify if that contaminant source can have an adverse impact on a receptor (such as humans or groundwater, for example).

Typical activities include:

* managing legislative issues for clients and maintaining an awareness of how legislation impacts projects;
* conducting field surveys: collecting data to establish a baseline condition for levels of pollution or contamination for a site or area of consideration;
* interpreting data: this can include detailed assessment of data, often using software-modelling packages to identify whether 'contamination' exists in accordance with current legislation;
* development of conceptual models: this involves identification and consideration of the potential contaminant sources, critical pathways and receptors that could potentially have an adverse impact on the immediate and wider environment;
* report writing: completion of detailed scientific reporting, written in a manner that can be understood by non-technical people;
* communicating with clients, regulators and sub-contractors e.g. analytical laboratories;
* researching previous investigations of a site to provide information to clients considering purchase; and possibly undertaking field work to identify previous activities on the site and any contamination.

Wednesday, December 1, 2010

Permissable for noise level at Factory and Machine

Regulation 5. Permissible exposure limit.
(1) No employee shall be exposed to noise level exceeding equivalent continuous sound level of 90 dB (A) or exceeding the limits specified in the First Schedule or exceeding the daily noise dose of unity. (2) No employee shall be exposed to noise level exceeding 115 dB (A) at any time.

Reference: FACTORIES AND MACHINERY (NOISE EXPOSURE) REGULATIONS 1989 PART II - PERMISSIBLE EXPOSURE LIMIT